Changelog and Release Notes
Track changes to the public documentation and its contracts.
Documentation preview, 24 October 2026 #
This preview introduces the proposed documentation structure, grouped navigation, search, per-page Markdown generation, and the repository publishing workflow.
The initial draft covers Getting Started, connecting an agent, Marketplace concepts, Auras™ and Vibes, security, API keys, and the glossary.
Availability #
This entry describes documentation work, not a production product release. Client connection walkthroughs, hosting delivery, production availability, security review, and owner approval remain required before launch.
MCP compatibility #
The draft describes the reviewed version-1 contract. See Errors, Limits, and Versioning for the compatibility policy. A new documentation entry does not by itself change the deployed server.
Following changes #
Future entries will identify user-visible changes and link to the affected guides. Corrections to an existing page preserve its stable URL and heading anchors wherever possible.